Production runs

Make a batch ahead — dough, sauces, bread — from a recipe: the ingredients leave stock when the run starts, the finished goods arrive when it is completed, at their cost.

Checked against the product on 13 October 2026

A recipe on a dish is used up at the till, dish by dish. A production run makes a stocked product in a batch ahead of time — 20 dough balls in the morning — so the flour leaves stock once, and the dough balls are then stock like anything you buy. It needs the Production & Recipes module.

The recipe for what you make

The product you make must be a stocked product with one active variant. Give it a recipe under ProductionRecipes: the output (1 piece of Dough Ball) and its ingredients, each in any unit that converts to the ingredient's own — 250 g of a flour stocked in kilograms. An ingredient you do not have yet can be made with New ingredient under the ingredient picker, without leaving the recipe. The Cost Rollup shows what one costs: 250 g at $1.20 a kilogram is $0.30. Press Activate on the recipe's page; only an active recipe can be produced.

The Dough Ball recipe, Active: output 1 pc; ingredient Type 55 Flour, 250 g; Cost Rollup Material Cost $0.30.
250 g of flour makes one dough ball, at $0.30.

Plan a run

  1. Create Order

    ProductionOrders, then Create Order.
  2. The recipe and where

    Type part of the Recipe's name and pick it. Pick the Location: the ingredients come off this location's stock, and the finished goods go onto it.
  3. How many

    Planned Qty and its UOM (20 pieces). Priority, dates and notes are optional. Press Create Order.
Create Order: Recipe Dough Ball, Location Otura Beirut Store - Main Counter with its hint, Planned Qty 20, UOM Piece, Priority, Planned Start and End, Notes.
A run of 20.

The order is Planned. Its page lists each ingredient's Required Qty in the recipe's unit — 20 × 250 g = 5,000.00 g of flour.

Start it

Start Order, and confirm. The ingredients leave the location's stock at once, converted to the unit they are stocked in (5 kg of flour), oldest stock first, and their cost is held as work in progress. If any ingredient is short, the start is refused, names it, and nothing moves; the order stays planned: Insufficient stock for Type 55 Flour (kg) at Otura Beirut Store - Main Counter. Requested: 12.5, Available: 10.

A planned run of 50 dough balls needing 12,500.00 g of flour; Start Order refused with Insufficient stock for Type 55 Flour (kg) at Otura Beirut Store - Main Counter. Requested: 12.5, Available: 10.
Not enough flour for 50: refused, nothing taken.

Complete it

Once started, the page asks for the Actual Qty made and shows the variance from the plan. Complete Order puts what was made into stock at the location, in the unit the product is stocked in (500 g of bread for a product stocked in kilograms is 0.5 kg), at the run's cost. A run with nothing made cannot be completed, and a run can be completed only once.

A started run: Actual Qty (pc) 20 and the Complete Order button; the ingredients show 5,000.00 g consumed.
20 made.
The run Completed: 20 dough balls made, 5,000.00 g of flour consumed.
Completed: the flour is down 5 kg, the dough balls up 20.